USNS Supply

USNS Supply
Marine Design Dynamics, Inc. (MDD) was awarded a task order from the Military Sealift Command to develop a series of work packages for modifications to the T-AOE6 USNS Supply. MDD will provide all design services for the modifications of multiple interior spaces and equipment including removal and installation drawings for arrangements, electrical, HVAC, piping and structural modifications. The USNS Supply is the lead ship of the Supply-class fast combat support ships.  She was commissioned 26 February 1994 as the USS Supply (AOE-6) and was transferred on August 29, 2003 to the Military Sealift Command which designated her USNS Supply (T-AOE-6).

 

Share This Press Release

Leave a Reply?

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>