Marine Design Dynamics, Inc. (MDD) was awarded a contract from the National Oceanic and Atmospheric Administration (NOAA) to perform design work for the installation of a Miranda Davit on the NOAA ship Gordon Gunter. Under this contract, MDD will conduct a stability analysis and develop detailed design drawings and specifications for all modifications relating to the installation of a Miranda Davit on the Port side of the ship including structural and hydraulic power modifications. The NOAA Ship Gordon Gunter was commissioned on August 28, 1998, and is one of the modern additions to the NOAA fishery research fleet. Operating throughout the Gulf of Mexico, Atlantic Ocean, and Caribbean Sea, Gordon Gunter is a multi-use platform that primarily serves the National Marine Fisheries Service Pascagoula Laboratory in Mississippi.
Leave a Reply?